Insulated Bearing Insulation Resistance
Updated 2026-10-13
Data records
- Insulated Bearing Insulation Resistance is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.8 of ANSI/NETA ATS-2025. Value: AC induction motors and generators.
- Insulated Bearing Insulation Resistance is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023. Value: synchronous motors and generators.
- Insulated Bearing Insulation Resistance is addressed in ANSI/NETA ATS-2025.
- Insulated Bearing Insulation Resistance is addressed in ANSI/NETA MTS-2023.
- The test method is named Insulated Bearing Insulation Resistance. Value: Insulated Bearing Insulation Resistance.
Elsewhere in the family
- ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications related entry on Electrical Testing Reference
- ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications related entry on Electrical Testing Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.15.1.B.8. Held as: Purchased single-user copy. Publisher page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.15.2.B. Held as: Purchased single-user copy. Publisher page
- Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
Obtaining the documents
- ANSI/NETA ATS-2025: publisher catalog or sales page
- ANSI/NETA MTS-2023: publisher catalog or sales page
Changelog (5 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.insulated-bearing-insulation-resistance.equipment.motor.acceptance) | |
| 2026-10-13 | created (tests.insulated-bearing-insulation-resistance.equipment.motor.maintenance) | |
| 2026-10-13 | created (tests.insulated-bearing-insulation-resistance.governed-by.ansi-neta-ats) | |
| 2026-10-13 | created (tests.insulated-bearing-insulation-resistance.governed-by.ansi-neta-mts) | |
| 2026-10-13 | created (tests.insulated-bearing-insulation-resistance.title) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Insulated Bearing Insulation Resistance." Motor Testing Reference. 2026-10-13. https://www.motortestingreference.com/tests/insulated-bearing-insulation-resistance/.
Motor Testing Reference, Insulated Bearing Insulation Resistance (Oct. 13, 2026), https://www.motortestingreference.com/tests/insulated-bearing-insulation-resistance/.
@misc{etr-tests-insulated-bearing-insulation-resistance,
title = {Insulated Bearing Insulation Resistance},
howpublished = {\url{https://www.motortestingreference.com/tests/insulated-bearing-insulation-resistance/}},
organization = {Motor Testing Reference},
publisher = {Motor Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Insulated Bearing Insulation Resistance |website=Motor Testing Reference |publisher=Motor Testing Reference |url=https://www.motortestingreference.com/tests/insulated-bearing-insulation-resistance/ |date=2026-10-13 |access-date=}}